MEDIA INDONESIA PUBLISHING SERVICE

ASSET INTEGRITY & RELIABILITY MANAGEMENT FOR POWER PLANTS

Objective: 

Minimizing Power Plant Failures and Un-planned Shutdown, and In Preparation for the Next 35,000 MW Reliable Power Plants Operation 

Outline
  • Introduction to Asset Integrity and Reliability Management for Power Plants. 
  • Damage Mechanism, Failure Mode and Failure Rates of Power Plant Equipment 
  • Equipment Criticality Analysis (ECA) 
  • Corrosion Under Insulation (CUI) and Damage Insulator Inspection for Steam Piping and Pipelines. 
  • Fitness for Service (FFS) and Remaining Life Assessment (RLA) for Piping and Pipelines, Boiler, Pressure Vessels, and Condenser. 
  • Root Cause Analysis (RCA) Methodology for Power Plant Equiments 
  • Reliability, Availability and Maintainability (RAM) Analysis for Power Plant. 
  • Fault Tree Analysis (FTA). 
  • Risk Based Inspection and Maintenance Power Plant Static Equipments. 
  • Reliability Centered Maintenance (RCM) for Pumps, Water, Steam and Gas Turbines. 
  • Life Cycle Cost for Maintenance and Repair Plan. 
  • Metric Measures, KPI for Integrity and Reliability Management Implementation. 
  • Gap Analysis and Road Map for Asset Integrity Management Development in Power Plant
Pelaksanaan : 7-8 Maret 2016


Gabung bersama MI.Komunitas untuk mengikuti berbagai pelatihan dan anda akan mendapatkan bonus berlangganan Koran Media Indonesia selama 3 bulan (gratis) Lihat jadwal pelatihannya DISINI

Share this article :

BUKU JURNALISME KEBERAGAMAN

Jadwal Training/Pelatihan lainnya




 
Created by : MI Komunitas
Copyright © 2012. MI Komunitas
Hak Paten : MI Komunitas